The system is set up in a classroom, so we had to use caution in
wiring. We inherited under-the-floor pipes through which we snaked
all the cables. The layout is shown below.
We chose the topology of a 2-D torus:
To accomodate the topology, we positioned the nodes to
reduce the amount of wiring we had to install: